SECTION 07560
(Fluid Applied Roofing)

 

ACRYLABS R45 

Reinforced Elastomeric Composite Membrane System
PART 1 – GENERAL

1.01 SUMMARY
A. Description: This section includes a fluid applied 45 mil reinforced elastomeric composite roof membrane system.
B. Section Includes: Reinforced elastomeric composite membrane system, complete with surface preparation, with all flashing and other related work required to perform a complete installation of the Acrylabs, Inc. system.

 

1.02 REFERENCES
A. American Society for Testing and Materials (ASTM) 1998 Annual Book of ASTM Standards
1. Designation : D6083-97a Standard Specification for Liquid Applied Acrylic Coating Used in Roofing
2. Volume 04.04 Roofing, Waterproofing, and Bituminous Materials
3. Volume 06.01 Paint- Tests for Chemical, Physical, and Optical Properties; Appearance
B. National Roofing Contractors Association (NRCA)
1. Roofing and Waterproofing Manual (4th Edition)

 

1.03 SYSTEM DESCRIPTION
A. Performance Requirements:
1. Provide fluid applied reinforced elastomeric composite membrane system in accordance with manufacturer's performance criteria without defects, damage, failure, or infiltration of water.


2. Coatings to be used in the membrane system shall meet or exceed all minimum testing requirements listed in ASTM D6083 Standard Specification for Liquid Applied Acrylic Coatings Used in Roofing.

 

1.04 SUBMITTALS
A. Product Data: Provide written technical information and installation instructions from Acrylabs, Inc. which demonstrate that materials to be installed comply with contract documents.
B. Submit shop drawings indicating details showing treatment of transitions, edges, closures, penetrations, etc.
C. Verify field measurements and submit materials list, including quantities, to be applied to achieve specified membrane thickness.
D. Submit 2-year contractor warranty against leaks and/or defects in workmanship. Upon notification of any such defects, within the first 2 years, the contractor will make the necessary repairs. Warranty shall be signed by an authorized representative of the contractor.
E. Submit written verification that the existing roof drain lines are reasonably free of obstruction prior to application of Acrylabs, Inc. product.
F. Submit Acrylabs, Inc. Material Safety Data Sheets (MSDS).

 

1.05 QUALITY ASSURANCE
A. Applicator Qualifications: Applicator who has proven experience in the installation of work similar to that required for this project for a period of 5 years or more.
1. Certificate: When requested, submit certificate indicating applicator qualifications.
2. Completed project reference list: When requested, submit a list of three (3) projects of similar nature using products of the type specified herein. List shall include the following: Project name and location, size, cost, contact person and phone number.

B. All details must be installed in conformance with the current Acrylabs, Inc. specifications and detail drawings.
C. Final inspection by an authorized representative of Acrylabs, Inc. may be required for warranty. Final inspection shall not replace the normal responsibilities of the contracting parties. Request for final inspections must be forwarded, along with a roof plan, to Acrylabs, Inc. upon substantial completion of the project. Any deviations from Acrylabs, Inc. specifications must be noted on the roof plan drawing.

D. Provide all primers, coatings, reinforcement fabrics and accessories as manufactured and/or approved in writing by Acrylabs, Inc.
1.06 DELIVERY, STORAGE AND HANDLING
A. Furnish Acrylabs, Inc. coating system materials and component accessories in manufacturer's original containers and/or wrapped bundles, clearly indicating the Acrylabs, Inc. label and other identifying information.
B. Store materials separated from the ground and in a dry location, protected until installation in accordance with Acrylabs, Inc. instructions.
C. Handle materials in accordance with Acrylabs, Inc. recommendations.
D. Protect materials against freezing. Store materials between 50ºF and 85ºF.

 

1.07 PROJECT CONDITIONS
A. Acceptable Substrates: Acceptable substrates for the 2001-R45 System shall be one of the following: Single Ply Membranes, Smooth Surfaced Built-up roofing, APP Modified Bituminous Roofing, SBS Modified Bituminous Roofing, Granular Surface Roll Roofing or other substrates approved in writing by Acrylabs, Inc.
B. Substrate: After existing roofing systems are cleaned and repaired, as required, but prior to starting membrane system installation work, complete all substrate corrective actions required, including but not limited to; removal and replacement of deteriorated flashing, roof decking, removal and replacement of wet insulation. Substrate shall be smooth, dry, and free of debris.

 

1.08 ENVIRONMENTAL CONDITIONS
A. It is the responsibility of the applicator to determine if present and forecast weather conditions are acceptable for application of Acrylabs, Inc. coatings. To qualify for warranty a log book of project weather conditions during application is to be kept by project foreman.
B. Do not apply Acrylabs, Inc. coatings when snow, rain, fog or freezing temperatures are possible within 24 hours after application.
C. Do not apply coatings when the temperature of surfaces to be coated and/or surrounding air temperatures are less than 45oF.
D. Do not apply Acrylabs, Inc. coatings when the dew point can be reached before the coatings have sufficiently dried or cured. Special consideration must be given during spring and autumn applications for rapid temperature changes near sunset, shortened workdays may be required.

E. Allow wet surfaces to dry thoroughly and to attain temperature and conditions specified before proceeding with or continuing coating operation.
F. Wind conditions must be considered during application of products to avoid damage to adjacent surfaces or completed work. Provide for protection of other surfaces or do not spray apply coatings if overspray will be deposited on surfaces not intended to be coated.

 

1.09 SAFETY REQUIREMENTS
A. Users should familiarize themselves with appropriate Material Safety Data Sheets (MSDS). MSDS must be available at all worksites where materials are being used.
B. Materials shall be applied in accordance with all applicable local, state, and federal regulations.
C. A respirator should be used when spraying Acrylabs, Inc. coatings to protect applicators from overspray particles.
D. When applying reflective white coatings to a roof, sunglasses should be used to protect eyes from glare.
E. Handle on pails should only be used to hand carry pail and should not be used to hoist pail from ground to roof.
F. All work shall be performed in conformance with the safety procedures outlined in the current FALL PROTECTION GUIDE as published by the Occupational Safety and Health Administration (OSHA). Information regarding OSHA Standards are available on the internet at www.osha.gov.
G. Care should be taken to avoid overhead power lines and arcing potential.

 

1.10 WORK SEQUENCE
A. Sequence of operations is at the applicator's option providing it is arranged to maintain the building dry during the life of the Contract. Schedule and execute work to prevent leaking.

 

                B. The building shall be occupied. Do not disrupt activities in occupied spaces.

 

1.11 WARRANTY
A. Furnish specified Acrylabs, Inc. warranty.

B. Furnish contractor 2-year warranty. The conditions of the contractor warranty may vary; however the occurrence of leaks caused by defects in workmanship will be remedied at no cost to the building owner according to provisions of the contractor warranty.

 

PART 2 – PRODUCTS
2.01 FLUID APPLIED REINFORCED COMPOSITE MEMBRANE SYSTEM
A. Manufacturer: Acrylabs, Inc. 730 Commercial Lane
1. Contact: 730 Commercial Ln.; Honey Brook, PA 19344
Phone(610) 273-1355; FAX (610) 273-1357
e-mail CustomerService@acrylabs.com  website www.acrylabs.com
 

               B. Substitutions: None

 

2.02 MATERIALS
A. The Acrylabs, Inc. 2001-R45 System shall include but not be limited to:
        1. Elastomeric Basecoat                 Acrylabs     2100B
        2. Elastomeric Finish Coat             Acrylabs     2100
        3. Polyester Reinforcing Fabric     Mesh 2000
B. Acrylabs, Inc. Minimum Material Properties
1. Elastomeric Coatings – Elastomeric coatings shall be water-dispersed 100% acrylic elastomeric coatings designed for use in reinforced composite membrane systems. Materials shall meet the following minimum specifications:
 

                a. Liquid Coating Property Requirements 2100B and 2100

 

                                        Minimum                      ASTM

Weight Per Gallon         12.0 lbs.                 D-1475-90

                                                Solids by Weight             >65%                     D-2369-97

Solids by Volume            >50%                    D-2697-86

                Viscosity                             95kU                     D-562-01

 

b. Cured Film Physical Property Requirements 2100B and 2100

 

                                                        Minimum                 ASTM Standard

Low Temperature Flexibility         pass                             D-734
                                @ -15º F
                Elongation at break                                                             D-412

    @74º F                                         245% h
           
    @ 0º.F                                          130%

                Tensile Strength at break                                                   D-412

    @74º.F                                         165psi

    @ 0º.F                                           660psi
            Permeability (20 mil film)             <10 perms                     E-96-80
            Accelerated weathering                 2 years-no effect          G-53
            Fungi Resistance                            Zero rating
2. Reinforcement Fabric – Stitchbonded polyester for use in cold fluid applied roof membranes that shall provide high strength and good elongation.

 

a. Mesh 2000 Fabric (Average typical properties)

 

                                                                    Average              ASTM Standard

            Tensile strength                                             57.1                         D-1682
            Elongation                                                     61.65%                      D-1682

 


2.03 APPLICATION EQUIPMENT

A. Acrylabs, Inc. coatings shall be applied by brush, roller, or spray. When applied by spray it is recommended that airless spray be used. Application by roller or brush may require additional coats, but material requirements will remain the same. In all cases, the specified minimum membrane thickness must be achieved.


2.04 RELATED MATERIALS
A. Related Products Supplied By Acrylabs, Inc.:
1. 2400 Flashing Grade Elastomeric
2. 3200 Rust Inhibitive Primer
3. 2500 Patching Compound
4. 3300 Concrete and Masonry Sealer
B. Roof Drain Flashing:
1. Specify as per requirements of project.

C. Sealant (Silicone sealant unacceptable)
1. Polyurethane
2. Polysulfide
3. Acrylic

PART 3 - EXECUTION


3.01 MANUFACTURERS INSTRUCTIONS

A. Compliance: Comply with Acrylabs, Inc. product data, recommendations, and installation instructions for substrate verification, preparation requirements, and installation.

3.02 EXAMINATION


A. Examine the substrates, flashing conditions, penetrations, equipment supports, curbs, adjoining construction and the conditions under which the work is to be installed. Do not proceed with the work until unsatisfactory conditions have been corrected and substrate is acceptable.
B. Applicator shall be responsible for providing a proper substrate to receive the Acrylabs, Inc. roofing system.
C. Verify that substrate is dry and free of oil, grease, dust, rust, or other contaminant.
D. Defects in substrate shall be noted and work shall not proceed until such defects have been corrected.


3.03 PREPARATION


A. Do not proceed with installation until projections through the Acrylabs, Inc. membrane such as piping, drains, conduit, vents and ducts have been installed. Holes shall be patched or filled and finished flush in accordance with Acrylabs, Inc. directions. Cut off high spots and grind smooth as applicable.
B. Substrate: After existing roofing systems are cleaned and repaired, as required, but prior to starting new roofing system installation work, complete all substrate corrective actions required. Substrate shall be smooth, dry, and free of debris
C. The roof must be completely free of dust, dirt, oil, debris, or other contaminants before application of Acrylabs, Inc. coatings or sealants. If any contaminants are found, they must be removed by appropriate means.
D. Protect area or surfaces not designated to receive Acrylabs, Inc. coatings against any damage or defacement resulting from the Acrylabs, Inc. System Application

3.04 INSTALLATION


A. Following inspection and acceptance of substrate condition, install the Acrylabs, Inc. 2001-R45 Roof System using minimum coverage indicated in the manufacturer's guidelines. Adherence to guidelines will yield a minimum membrane thickness of 45 mils over entire surface covered.
B. Apply reinforcement fabric and basecoat to field of roof:
1. Apply tack coat of 2100B at approximately 1.5 gallons per 100 square feet to surface. Immediately embed MESH 2000 Polyester Reinforcement into wet coating. Care must be taken to lay the fabric to the contact surface avoiding wrinkles, fishmouths, etc.
2. Roller or brush shall be used to insure that Mesh 2000 is fully embedded.
3. After embedding MESH 2000 into wet coating apply an additional coat of 2100B, at a minimum rate of 1.5 gallon per 100 sq. ft. completely saturating Mesh 2000 fabric.
4. Achieve a total of 30 mil base membrane thickness.
C. Apply flashings at roof penetrations and detail work:
1. All flashings must be completed in accordance with published Acrylabs, Inc. details before final application of 2100 Finish Coatings.
2. Apply heavy coat of 2100B to the area to be flashed, and embed Mesh 2000 Reinforcement Fabric into wet coating.
3. Brush shall be used to insure that Mesh 2000 is fully embedded.
4. Apply additional coating to the top of fabric taking care to completely saturate fabric and provide a weatherproof seal.
D. Repair all fishmouths, bridging, or other defects in the previously applied Mesh 2000 Reinforcement Fabric by cutting excess fabric, if required, and making necessary repairs using Mesh 2000 and 2100B.
E. Apply intermediate coat: Apply first coat of 2100 to entire surface previously covered with Mesh 2000 reinforcement fabric including field of roof, gussets, penetrations, and perimeter locations. A minimum of 1 gallon of 2100 per 100 sq. ft. is required.
F. Apply finish coat in color specified: Apply finish coat of 2100 to entire surface previously coated. A minimum of 1 gallon of 2100 per 100 sq. ft. is required.
G. If necessary apply additional 2100, where required, to insure that the minimum 45 mils total membrane thickness is achieved.

3.05 FIELD QUALITY REQUIREMENTS


A. Verify final film thickness as specified. If specified dry film thickness has not been achieved, application of additional coating will be required.
B. Visually inspect critical areas of the roof including roof seams and penetrations and touch up with additional Acrylabs, Inc. coatings to insure complete and adequate coverage.

3.06 FINAL CLEANING


A. Except as otherwise provided for remove temporary protection devices and facilities which were installed during the course of the work.
B. Clean project site, sweep paved areas, rake clean other surfaces of roofing debris.
C. Remove debris, surplus materials and trash from project site.
D. All soiled surfaces shall be cleaned using approved materials and methods.

3.07 PROTECTION OF COMPLETED MEMBRANE


A. Protect completed membrane from damage by work of other trades. Schedule sequence of work so that traffic over new membrane is minimized. Institute required procedures for protection of completed membrane during installation of work from other trades throughout remainder of construction period. Do not allow traffic of any type on unprotected membrane.
B. At completion of construction activities of other trades, touch-up and restore damaged or defaced coated surfaces. Correct damage by cleaning, repairing, replacing, and/or recoating to make acceptable to the specifier and/or Acrylabs Inc. Leave in an undamaged condition
 

END OF SECTION

 

roofing systems msds

"We cover the future . . . and the past."

 

Renewable - Sustainable - Seamless - Environmentally Responsible
Exceptional Durability - Flexible - UV Resistant - ASTM Tested
Reduces Energy Costs - Outstanding Performance - Unmatched Service